HomeAll NewsBiogas (CBG)Gothenburg Port biogas liquefaction plant reaches milestone with storage tank installation

Gothenburg Port biogas liquefaction plant reaches milestone with storage tank installation

Construction of a biogas liquefaction plant at Sweden’s Port of Gothenburg has reached a major milestone with the installation of its liquefied biogas (LBG) storage tank. The facility is expected to be completed in the second quarter of 2027 and will help make Swedish biogas more widely available, particularly to the shipping sector, Container News reported.

LBG is a renewable fuel with a lower climate impact than fossil fuels and can be used as an alternative to conventional marine fuels. Demand for the fuel is increasing in the shipping industry.

Work on the plant’s foundations and base slabs has been completed, and the storage tank is the first major component to be installed. Transported to the port by vessel, the tank has a capacity of 500 cubic metres, weighs nearly 140 tonnes and will be able to store up to 200 tonnes of LBG once the plant becomes operational.

The facility is expected to produce 250 gigawatt-hours of LBG annually. This is equivalent to the fuel consumption of around 500 trucks or enough to supply 50 vessels.

The plant will be the first liquefaction facility in Sweden directly connected to the west Swedish gas grid. It is expected to create new market opportunities for Swedish biogas producers that are already connected to the grid or plan to join it.

Biogas producers and users are already active at the port. ST1 Biokraft has signed an agreement to secure part of the plant’s capacity, while several shipping companies that regularly visit the port are already using LBG to power their vessels.

Therese Jällbrink, Head of Renewable Energy at the Port of Gothenburg, said the transition to cleaner shipping requires cooperation across the entire supply chain. She said the new facility would strengthen the port’s position in renewable marine fuels and allow it to supply LBG to ships on a larger scale. The growing number of vessels being built to operate on LBG also indicates scope for increased fuel supply at the port.

Carolina Wistén, Head of Customer and Market, Gas Grid, at Nordion Energi, said construction of the facility was progressing and bringing closer the goal of supplying LBG from the gas grid to shipping, heavy transport and industry.

spot_img

JOIN OUR MAIL LIST

Subscribe to BioEnergyTimes

RELATED ARTICLES
spot_img

Most Popular